Skip to content
All trades

For HVAC and refrigeration distributors

Stocked when the first heat wave hits, not two weeks after

Heating in the fall, cooling in early summer, and a refrigerant change in between. Datazimuts reads your ERP’s exports, cleans the item data first, and tells your buyers every morning what to order from each supplier, with the reason behind every quantity.

What goes wrong

Where the buying goes wrong

  • Caught by the first heat wave

    The first hot week empties capacitors, contactors and condenser fan motors in every branch at once, just when the suppliers’ lead times get longer.

  • Equipment that waits a season

    Condensers bought for a summer that came late sit until next year, and parts for older refrigerant equipment lose value as the change to A2L goes on.

  • Increases announced every year

    Manufacturers announce price increases a few weeks ahead. Buying ahead with judgment saves money; buying too much ties up the cash you need in season.

What Datazimuts does

A plan every morning, and nothing sent without a yes

  • The order plan, supplier by supplier

    Every morning, what to order from each supplier, rounded to their packs and minimums, with the reason behind every quantity.

  • The item doctor first

    Unit and price-unit errors, duplicates and phantom stock are found before any forecast. An item with a problem gets no order line until a person confirms the fix.

  • A free health check, in ranges

    Dead, excess and returnable stock, rebates within reach and stock to verify, each as a low and a likely figure with its evidence. Never a promise.

  • Supplier invoices, read and matched

    Forward invoices to your own address. Each one is matched to its PO and receipt; a price or quantity that differs is held with its reason and dollars.

  • Alerts in plain words

    Write the rule the way you would say it. You see it as understood, tried on today’s data, before it starts.

  • Drafts in your ERP, after a yes

    Nothing reaches a supplier on its own. A buyer approves, then the POs land in your ERP as drafts, or as files you import yourself.

What moves the numbers

What moves your demand and your costs

  • Heating and cooling degree-days

    A cold snap or a heat wave moves furnace parts, circulators, condensers and refrigerant within days. The forecast starts from each branch’s own past seasons and plans to a range, so a normal swing is covered.

  • The move to A2L refrigerants

    Equipment for older refrigerants runs down while A2L equipment, cylinders and tools arrive with no sales history. When a model number is replaced, the item doctor links the old one to the new, so the forecast keeps the history, and it flags stock left on the old one.

  • Copper

    Copper moves the price of wire, pipe, fittings and motors, and suppliers pass it on with a few weeks’ notice. Enter an announced increase once: the next plan reads it, and each line it touches says so.

  • Steel

    Steel sets the price of fasteners, pipe, strut, studs and much of what is made from it. An announced increase goes in once, and the next plan reads it.

  • The exchange rate

    Goods bought in US dollars cost more when the Canadian dollar weakens. Orders keep their currency, approval limits count US-dollar orders at your rate, and an expected change of rate goes in as an event.

  • Renovation and service work

    Repairs and renovations keep a steady base under the season, spread over many small orders. Each line’s likely demand comes with its range.

A typical year

Two peaks: cooling from June to August, heating from October to January. Spring and early fall are when buyers can get ahead, if the plan tells them how much.

An illustration of the usual shape. Yours comes from your own sales, branch by branch.

The item doctor

Unit traps caught before any order

An item with an unresolved unit problem gets no order line and no dollar figure until a person confirms the fix.

  • Tubing and line sets by the roll

    Copper tubing and line sets bought by the 50-ft roll and sold by the foot: the doctor checks the roll length against how the item sells.

  • Cylinders and cases

    Refrigerant bought by the cylinder and filters by the case, then sold one by one: the purchase and sales units have to agree before any order.

  • Fittings priced per 100

    Brazing fittings and fasteners priced per 100 or per 1,000 but counted by the piece.

  • The same part twice

    The same capacitor entered once in French and once in English, or under two supplier numbers: each half looks slow, and both get reordered.

Buying ahead

Should you buy ahead of an increase?

Buying before an increase saves on every unit, and costs money to hold until it sells. Move the sliders on a made-up example to see where it stops paying.

Illustration · made-up figures

Buy ahead of an announced price change?

Furnaces and condensers from one manufacturer: about $15,000 bought a week.

Net on the buy-ahead, low to likely

+$2.3k–2.4k

Saved on the change
+$3k
Holding the extra stock
−$600

Worth a look: even the low figure comes out ahead.

Holding stock is counted at about 20% of its value a year; the low figure assumes it sells 20% slower than expected. In the app, you enter an announced change once and the plan reads it with your own prices, lead times and demand.

Your ERP

Reads the ERP you already run

Eight ERPs have a ready mapping, and any other can send CSV or Excel exports. Each export guide names the five lists to send and where to find them.

Any other ERP: a CSV or Excel export

Free health check

Get your free health check

Tell us who you are and which ERP you run; your trade is already chosen. We write back with the export guide for your ERP and the next steps.

The request form: every field is needed.

We use your address only to answer this request.